Schneider Electric says energy-efficiency upgrades in data centers pay back in 1-3 years, yet efficiency remains underprioritized as AI drives power demand.Read More
Global Market Insights Reports on Ultra-Fast EV Charging
2 sources Ultra-fast EV charging (350-400 kW) projected to reach $15 billion by 2027, contingent on widespread 800 V EV architecture Read More
Solid-State Transformer Industry Reality Check: What Patents
10 sources A May 2026 audit found fewer than 10 commercially deployed SSTs in global revenue service, while dozens of Read More
The MGRID Solid-State Transformer Coverage: A Comprehensive Index
Index of ~100 MGRID articles published May 2026 covering SST origins, manufacturers, deployments, federal programs, technology foundations, and applications.Read More
Silicon Carbide vs Gallium Nitride: Why Every Medium-Voltage
4 sources All commercial medium-voltage SSTs use SiC MOSFETs for 650 V–6.5 kV input stages. GaN is limited to Read More
ISO New England Adds First Data Center Load Forecast: 285 MW in Study
4 sources ISO New England's first dedicated large-load forecast counts just two data center projects totaling 285 MW, projecting Read More
POWER Magazine: 27% of US Data Centers to Run on Onsite Generation
5 sources S&P Global projects 27% of US data centers will run entirely on onsite generation by 2030, representing 35 Read More
Efficiency Canada Argues Doubling Grid Capacity Misses
3 sources Efficiency Canada argues Powering Canada Strong underweights demand-side measures: efficiency saves at C$0.03/kWh versus C$0.12Read More
How Moving AI Data Centers to 800 VDC Distribution and Solid-State Transformers Sidesteps Phase Imbalance Entirely
3 sources NVIDIA 800 VDC data center architecture eliminates AC phases downstream of a solid-state transformer, bypassing phase-imbalance problems Read More
The Modern Solid-State Transformer Patent Landscape: Eaton
5 sources Eaton's $86M Resilient Power acquisition in Aug 2025 reshaped the SST patent landscape. ABB, Hitachi Energy, and Read More