Trending
4 sources DOE Emergency Order 202-26-23 authorized PJM to dispatch backup generators at data centers and large loads during a May 2026 heat wave under Federal Power Act §202(c).
4 sources Army ERCIP FY2025 awards $47.2M for 23 MW solar and 69 MWh battery microgrids at Fort Liberty, NC and Fort Cavazos, TX, enabling 72-hour islanding capability.
5 sources Army Corps of Engineers awarded a $42.6M microgrid contract for Fort Liberty JSOC in September 2024 and dual Puerto Rico ARC microgrids in August 2024, each designed for…