Schneider Electric Adds 1.5 MW NMC Battery to MCAS Miramar
ยท C&I Storage
3 sources Schneider Electric completed a 1.5 MW / 3.3 MWh NMC battery at MCAS Miramar, reinforcing a Marine Corps microgrid that already demonstrated 21-day islanding without the commercial grid.